Projects

Case Studies

We have more than 45 years of experience managing custom, multi-disciplined projects ranging from design, fabrication, on-site installation, operation and equipment maintenance.

Surface-Dewatering

Surface Dewatering

In the Mining environment, surface dewatering is an essential service Ketek provides to manage a number of different scenarios.

Ketek - Three Hills

Layflat Hose for Completions

Ketek installed a 20-kilometre line (of eight-inch diameter layflat hose) from an old gravel pit to a client’s frac site.

Ketek - Dickson Dam Pump Installation

Vertical Turbine Pump Installation

Ketek was recently asked to remove, repair and reinstall a 75-foot-tall vertical turbine pump at the Dickson Dam

Six 58 HP submersible pumps (in floats)

Large-Volume Water Transfer

Ketek built a 27-pump system that ran for 18 kilometres from the Peace River

Ketek - Wellpoint Dewatering

Wellpoint Dewatering

Ketek has the equipment and the expertise to carry out a wellpoint dewatering job successfully.

Fusing-GP-Ketek

Fusing HDPE Pipe

Fusing HDPE (high-density polyethylene) pipe is a Ketek specialty

Camrose WTP

Municipal Water Treatment Plant

Ketek replaces five pumps at the Camrose Water Treatment Plant

IPCS-case-study

Intelligent Pump Control Systems

Designed and manufactured for reliable well-water flow control.

SmartTek - Ketek Technologies

Save fuel. Save time. Save money!

Our Project Management Team is supported by our proprietary SmartTEK technology. Now, in real time and from the comfort of an office or the convenience of a phone, we can control our equipment and monitor its performance. We can have lights turn on and off based on ambient light. We know if a machine needs fuel or maintenance, and much more.

SmartTEK-Dashboard-Equipment
Our multi-disciplinary services are provided through operating facilities in Edmonton, Fort McMurray, Grande PrairieFort St. John, Fort Nelson and Saskatoon.