Ketek combines extensive experience with skilled professionals to provide complete solutions from project start to finish. Our field operations are supported by a strong team of tradespeople who deliver expert design and manufacturing assistance. Both our field crews and trades experts are industry leaders, known for their dedication to safety, quality, and exceptional performance on every project.
Services
Ketek Group provides a wide range of mining services focused primarily on water management, equipment rentals, transportation, safety training, and maintenance. Our offerings include surface and groundwater control, well testing, pump maintenance, and a large fleet of rental equipment such as pumps, generators, and mobile buildings. We also provide transportation solutions for heavy equipment, comprehensive safety training, and environmental services like waste management and pollution control. With over 45 years of experience and a partnership with Infinity Métis Corporation, Ketek is a trusted provider supporting mining operations throughout Western Canada.
Equipment Rentals
10,000+ pieces of primary, numbered rental equipment and tens of thousands of pieces of auxiliary equipment. Much of our fleet has been custom manufactured or individually modified to endure the rigours of industrial use and the challenging environments in which we operate. Our equipment fleet is impeccably maintained and new equipment is continually being added.
Case Studies
With over 45 years of experience, we specialize in managing complex, multi-disciplinary projects—from design and fabrication to on-site installation, operation, and equipment maintenance. We tailor our services to meet your specific project requirements, ensuring every detail is handled with care. Whether you need design expertise, engineering, drafting, document control, or a full project turn-over package, the Ketek project team is here to support you every step of the way.
Surface Dewatering
In the Mining environment, surface dewatering is an essential service Ketek provides to manage a number of different scenarios.
Layflat Hose for Completions
Ketek installed a 20-kilometre line (of eight-inch diameter layflat hose) from an old gravel pit to a client’s frac site.
Large-Volume Water Transfer
Ketek built a pumping system that ran for 18 kilometres from the Peace River.


















